 Project Description   Client   Value of Work $ 
  •  Supply & Install 2 x 20 Man Permanent  Camp Dining Room/Kitchen and Office. (2011)
 Tunis Inti Abadi               1,500,000
  •  Project Management – Tanjung Jati Power Station (2009-2010). Value of Project $22 million.  
 Tanjung Jati   
  •  Field inspection of site conditions, topographical survey, civil design and construction estimate of Teratai, Bakung, Akasia, Anggrek and Phinisi well sites and access roads, Lahat, South Sumatera (2009) 
 APEC – BMIC               2,464,592
  •  Civil engineering design, civil construction methodologies and construction estimates for the development of Budi-2 and Budi-3 well sites, South Sumatera (2009) 
 Tately N.V               1,003,015
  •  Civil engineering design, civil construction methodologies and construction estimates for the development of Budong Budong well sites, Sulawesi (2009) 
 Tately NV.               3,671,824
  •  Construction Management - Plant & Infrastructure (2006-2009). Value of Project $260 million. 
 Sampoerna   
  •  Project Management – Newmont Scavenger upgrade (2008). 
 Newmont               1,500,000
  •  Drilling Support Services: Engineer, Procure & Construct all civil engineering requirements (2008). 
 Citic Seram                  605,555
  •  Dawang Access Road Design & Reconstruction. Approximately 21 KM of potholed, flooded public road reconstructed. Nine bridges were incapable of heavy loading and were bypassed by the construction of stream crossinggs (2008). 
 Citic Seram                  473,453
  • Supply 250 Man Permanent Camp. Site work, Concrete, Dining Room/Kitchen, TV/Recreation Room, Laundry Area. Generator Building. Water Treatment Plant. Treated Water Reticulation. Sewage Treatment Plant. Sewage reticulation. Fire Hydrant System. Power Generator Plant. Diesel Fuel Tank. Electrical Distribution System. Area Lighting. Lightning Protection. Construction Drawing As Built 2008.
 Agincourt               3,882,753
  •  SupplyDawang Access Road Design & Reconstruction. Approximately 21 KM of potholed, flooded public road reconstructed. Nine bridges were incapable of heavy loading and were bypassed by the construction of stream crossinggs (2008). 
 Citic Seram                  473,453
  •  Provision of 3 units Crude Tank Trucks &1 unit Vacuum Trucks for 9 Months Period (2008) 
                  466,560
 Citic Seram 
  •  Basundan 1 Well site - Geotechnical Remedial Works (2007) 
 BPREC                  647,775
  •  Construction of three reinforced concrete cellars (in rock) next to a live production well (sour gas). Fabricate & install a 12 meter high x 80 meter long wire mesh rockfall catchment fence (2006).                     
 KUFPEC                  460,039
  •  Civil construction management Pasundan 1 Access Road & Wellsite construction - Jonggol, West Java (2006). 
 BPREC               2,800,000
  • Two year Civil Construction, Operations and Maintenance Contract. Provided management, engineering, operators, technicians, QA/QC, safety, logistics/materials, tools and heavy equipment. Work performed in all areas of lease to include: Main Production Facility, Field Facility,Marine Export Jetty and Loading Pier, 40 + km of roads, wellsites, bridges and pipeline right-of-ways (2005).
 KUFPEC               4,217,767
  •  Civil Road Construction, maintenance & repair (2005) 
 KUFPEC               1,545,000
  •  Project Management – Office Tower South Jakarta (2005-2006) - Value of Project $26 million. 